Lead/Sr. Piping/Pipeline engineer in PT Erraenersi Konstruksindo,
Job Experience
Lead/Sr. Piping/Pipeline engineer
PT Erraenersi Konstruksindo,
June 2014 to Actually working here
DOCUMENTS - Basis of Design and Philosophy - Pipeline Design Basis - Analysis / Calculation - On Bottom Stability Analysis - Free Span Analysis - Expansion Analysis - Riser Stress Analysis - Buckling Analysis - Crossing Analysis - Pipeline Wall Thickness Calculation - Cathodic Protection Calculation - Fatigue Life of Pipeline Design - Pigging Study - PLEM Structural Design - study - Preliminary Pipe Laying Analysis - Pipeline Riser Clamp Analysis Data Sheet - Line Pipe Data Sheet - Barred Tee Data Sheet - Pipe Hot Induction Bend and Data Sheet - Subsea Ball Valve Data Sheet - Line Pipe Coating Data Sheet - Monolithic Insulation joint Data Sheet - Flexible Pipe Data Sheet - Anti-Corrosion Coatings Datasheet. - Concrete Coating Datasheet. - Concrete Weight Coating Datasheet. Drawing - Pipeline Schematic from NGL to SPM-1 for Line A&B - Pipeline Schematic from SPM-1 to SPM-2 - Pipeline Overall Layout & Key Plan - Pipeline route layout from NGLto SPM-1 for Line A&B - Pipeline route layout from SPM-1 to SPM-2 - Pipeline Approach at NGL area - Pipeline Approach at SPM-1 Area - Pipeline Approach at SPM-2 Area - Riser and Dog Leg Arrangement for Line A - Riser and Dog Leg Arrangement for Line B - Riser and Dog Leg Make-up detail for Line A - Riser and Dog Leg Make-up detail for Line B - Pipeline Alignment Sheet from NGL to SPM-1 for Line A - Pipeline Alignment Sheet from NGL to SPM-1 for Line B - Pipeline Alignment Sheet for SPM-1 to SPM-2 - PLEM General Arrangement - Field Joint Coating Detail - Anode Detail Drawing - Pipe Crossing Detail - Riser Clamp Section and Detail Material Take-Off (MTO) - MTO for Pipelines - MTO for Flexible Pipe
Sr. Piping / Pipeline Engineer
PHE Onwj
December 2013 to March 2014
1. All document analysis and Procedure to 16? pipeline installation 10 km of MMF to LPRO platform. 2. All document analysis and Procedure to 16? pipeline installation 0.7 km of KLA-KLB Platform. 3. All document analysis and Procedure to 4? pipeline installation 1 km of KLA-KLB platform. 4. All document analysis and Procedure to 12? pipeline installation 10 km as well at its riser installation at LPRO platform side and 2.7 km of 12? pipeline replacement LESA-KLB platform, 5. Technical aspects related to the pipeline Hydrotesting and Pre-commissioning activities. 6. Design of the temporary items to be pre-fabricated for the execution of the Hydrotesting and Pre-commissioning operation and follow up the fabrication process. 7. Develop the technical documentation related to the Hydrotesting and Pre-commissioning activities defined by either the bid of project requirements. together with the Commissioning Lead Manager, the pre-commissioning, commissioning, start up and test run execution plans. 8. Attend meetings with the Company and hydrotesting & pre-commissioning subcontractors to resolve issues which can arise during document review / approval. 9. Pre-commissioning, commissioning, start-up and handing over procedures; 10. Procedure hydrotesting and pre-commissioning subcontractors during the execution of site operations. 11. Procedure of performing pipeline filling, cleaning, gauging, hydrostatic testing, dewatering, air drying and nitrogen purging; 12. Procedure Hydrotesting & pre-commissioning project equipment.
LEAD PIPING ENGINEER
PT. TIMAS SUPLINDO
April 2013 to December 2013
1. Having the responsibility of all Technical Query regarding piping works 2. Material take-off and schedule and mobilisation 3. Shop fabrication modification unit and tools well service testing as per Procedure 4. Installation as per Procedure 2. Lifting plan preparation as per Procedure
LEAD PIPELINE ENGINEER
PT. SINGGAR MULIA
January 2013 to March 2013
Lead Pipeline Engineer undertake Pipeline FEED and Detailed engineering design work as part of the pipeline team on project Petro china indonesia 16? Pipeline Onshore process gas Project 25 km Reporting to the FEED Pipelines Project Manager. Develop and prepare pipeline design reports, specifications, philosophies, data sheets etc. Possible requirement for site visits to Petro china Indonesia site area jambi - Sumatra .Pipeline design calculations pipeline installation : 1. Wall thickness, on-bottom stability, 3. Free Spanning, Expansion Analysis, 4. Upheaval Buckling, 5. On-bottom stability, 6. Rock dumping calculations, 7. Dropped Object Impact, 8. Cathodic Protection design calcs. 9. Design Reviews of design consultant documents. 10 Developed new CP design sheet for optimisation of anode requirement. 11. Exposure to flexible pipes, manufacturing methods and modeling. 12. Review of Design consultants design reports, pipeline specifications, & design drawings 13. Exposed to Preparation of Pipeline Design Basis.
Sr. Pipeline Offshore Engineer
PT. RAJAWALI SWIBER CAKRAWALA (SWIBER GROUP)
May 2012 to December 2012
1. Preparing Pipeline External Corrosion Coating and Protection Optimization Report 2. Pipeline Route, ROW and Constructability Report 3. Trunkline Size Optimization Report 4. Pipeline Stress Analysis Report 5. Pipeline Installation Design Analysis Report (buoyancy control, elastic bend calc, anchoring analysis, and pipeline laying analysis). 6. Preparing pipeline material specifications, datasheets and MTO. 7. Check and review pipeline alignment sheets, isometrics and typical drawings.
Education
Industrial Engineer
University muhammadiyah MagelangCurrently studying
ENGINEERING INDUSTRIAL
UNIV. MUH. MAGELANGCurrently studying
INDUSTRIAL ENGINEER
UMMCurrently studying
ENGINEER
UMMCurrently studying
Languages
English
Medium
IT skills
WORD, EXCEL, AUTOCAD, PDMS, CAESAR II
Experto
MS word application
Experto
Auto-cad v2014
Experto
PDMS
Experto
Other Skills
More Aan
Career Goals
Adding Science And Find Money
Industries of interest
Construction Industry Industry Mining / Oil / Gas Oil Industry
Areas of interest
Availability to travel and work outside the city
Yes