Assistant Piping & Stationary Engineer I in PT Biro Klasifikasi Indonesia
Job Experience
Assistant Piping & Stationary Engineer I
PT Biro Klasifikasi Indonesia
January 2013 to December 2013
- Assessing stationary equipment such as furnace, column, tank, reactor, pressure vessel, heat exchanger, piping, etc in area Paraxylene Pertamina RU IV Cilacap.
- Make recommendations for all stationary equipments and piping in area Paraxylene Pertamina RU IV Cilacap.
Assistant Piping & Stationary Engineer I
PT Biro Klasifikasi Indonesia
January 2012 to December 2012
- Assessing stationary equipment such as furnace, column, tank, reactor, pressure vessel, heat exchanger, piping, etc in area Fuel Oil Complex I, Lube Oil Complex I, Sulphur Recovery Unit, and Non Fuel Tankage Area Pertamina RU IV Cilacap.
- Make recommendations for all stationary equipments and piping in area Fuel Oil Complex I, Lube Oil Complex I, Sulphur Recovery Unit, and Non Fuel Tankage Area Pertamina RU IV Cilacap
- Take a part on Stop Unit 21 Lube Oil Complex I Pertamina RU IV Cilacap in January 2012 for assessing heat exchanger.
- Take a part on Stop Unit 23 - 24 Lube Oil Complex I Pertamina RU IV Cilacap in March 2012 for assessing heat exchanger
Assistant Piping & Stationary Engineer
PT Superintending Company of Indonesia
January 2009 to December 2010
- Assessing stationary equipment such as furnace, column, tank, reactor, pressure vessel, heat exchanger, piping, etc in all area Pertamina RU IV Cilacap
- Take a part on Turn Around Kilang II Pertamina RU IV Cilacap on July - August 2010 for assessing equipment furnace, column, heat exchanger, pressure vessel, reactor, and piping
Assistant Inspector
PT Biro Klasifikasi Indonesia
October 2008 to December 2008
- Assessing stationary equipment such as furnace, column, tank, reactor, pressure vessel, heat exchanger, piping, etc in all area Pertamina RU IV Cilacap.
- Take a part on Turn Around Kilang I Pertamina RU IV Cilacap in August 2008 for assessing equipment furnace, heat exchanger, pressure vessel, reactor, column and piping.
Non Destructive Testing Technician
PT Biro Klasifikasi Indonesia
September 2007 to September 2008
Perform non destructive testing such as liquid penetrant test, magnetic particle test, boroscope test, thickness measurement on piping, welding and equipment in Pertamina RU IV Cilacap
Non Destructive Testing Technician
PT Anaku Pratama
February 2006 to February 2007
Perform non destructive testing such as liquid penetrant test, magnetic particle test, and thickness measurement for Ships
Education
Non Destructive Examination Level 2 MT/PT
Balai Besar Bahan & Barang Teknik Bandung (Indonesia)September 2013 to September 2013
Languages
English
Medium
IT skills
Skilled
Advanced
Other Skills
More G. Bagol
Career Goals
Industries of interest
Areas of interest
Availability to travel and work outside the city
No