Wireline Operator in Baker Hughes Inc.

Cileggon, Banten, Indonesia
Current:Baker Hughes Inc.
Past:COSL Indonesia
Education:Bachelor Degree Petroleum Engineering

Job Experience

Wireline Operator

Baker Hughes Inc.

August 2014 to July 2016

Perform Cased Hole operation at TOTAL EP East Kalimantan and Cevron with Pressure Control
Equipment or Grease Inject Tool and Rig Less job Operation.
Prepare and Perform well perforation Job.
Prepare and Perform well plugging operation with Baker Setting Tools.Prepare and perform
cementing well cased hole operation with dump bailer.Prepare and perform Cement Bond Logging.
Prepare and perform cutting tubing operation with jet cutter method.Prepare and perform well
abandond operation.
Doing explosive transportation between barge or from workshop to location.
Assist Chief and Engineer to set up and set down wireline unit and PCE unit or change unit.
Assist Specialist to prepare and testing PCE before shipping and using in location.
Assist Specialist to Spooling and Unspooling cable in workshop.

Wireline Operator

COSL Indonesia

January 2014 to July 2014

Prepare Open Hole and Cased Hole tools for Shiping to location.
Check main and back up tools which using for job.
Inventory all tools and other support tools in warehouse.
Assist Chief and Engineer to PM the tools.
Assist Chief to Spooling and unspooling cable.
Assist Chief to make OH Cable head.

Internship Student

PPPTMG LEMIGAS

May 2013 to July 2013

Studied about make a sample formula for drilling mud and how test all properties of drilling mud.
Making sample of drilling mud and doing test to know effect additional of pressure and
temperature on the rheology properties of sample drilling mud using Fann Model 75 Automatic
Viscometer  with 2 condotion, before and afterhot roll at 325 deg F as my job report.
Make a report to PPPTMGB LEMIGAS and Akademi Minyak dan Gas BALONGAN with title
 "Analysis of the Influence of Additional Pressure and Temperature on Properties of KCL Polymer
Mud Design", and do presentation to lecture of Akademi Minyak dan Gas BALONGAN

Intrenship Student

ELNUSA

October 2012 to January 2013

Tudied about make a sample formula for cement slurry and how test all properties of cement
slurry.
Making sample of cement slurry and doing test to know effect additional of dispersant additive to
free water and sedimentation system of cement slurry as my job report.
Make a report to PT.ELNUSA Tbk and Akademi Minyak dan Gas BALONGAN with title  "Analysis
of the Influence of Additional Dispersant to Free Water and Sedimentation Cement Slurry at 15.8
ppg Net Cement", and do presentation to lecture of Akademi Minyak dan Gas BALONGAN.

Education

Bachelor Degree Petroleum Engineering

Universitas Proklamasi 45 Yogyakarta

Currently studying

Diploma III, Petroleum Engineering

Akademi Minyak dan Gas Balongan

Currently studying

Languages

IT skills

Other Skills

More Hadi

Career Goals

Industries of interest

Areas of interest

Availability to travel and work outside the city

No

Interests and hobbies