SMP SUPERVISOR in Downer Construction
Job Experience
SMP SUPERVISOR
Downer Construction
April 2015 to August 2015
Craft Piping/Mechanical Supervisor
Bechtel Oil, Gas, & Chemicals
December 2014 to Actually working here
Completion Senior Supervisor Enerflex
Enerflex Ltd.
February 2014 to Actually working here
Over seeing the Completion of the Insterlation screw Compressors Hub5 Roma Flour/Glough Downer QLNG Project all out standing Punch List Items R2,H4,H5
Enerflex/Howden Rectification lead,CSMP
Howden
December 2013 to February 2014
In put for permit request and isolation of Howden compressor on QCLNG Project Dalby and preparation works to re set proximity probes and test voltage internal on the compressor through out QGC/Thiess projects on the Howden compressors
Project Superintendent
Enerflex Ltd.
July 2013 to December 2013
EMC-Gupco-BP-Constructability Review Lead
EMC
January 2012 to January 2013
Until recently I was serving as Constructability Review Lead with EMC- GUPCO-BP, REHAB Project Red Sea, Egypt. My key responsibilities across my career span have included managing all aspects of construction including means and methods, safety procedures, agreements and jurisdictions, change management and cost and schedule management. My performance has been highly appreciated by the management.
Piping Supervisor /Superintendent
John Holland
October 2010 to November 2011
Worked as piping supervisor for welders, pipefitter, boilermakers and fitters and on piping installation of gas train 1 & 2 Condi load out, firewater systems changed over to pre-commissioning and running crew in installation of mechanical equipment after hydro. Ensured sign off as per work pack of ITP drawing mark-up red line drawings as per REQ, SI, as per AEL procedures.
Piping and Mechanical AGC
AGC
January 2010 to September 2010
Mechanical preparation pre-commissioning for Hydro's Pluto
Contract Supervisor
BHP Billiton
October 2008 to January 2009
over view between BHP and contractors to make sure all contractor meet BHP dead line and resolve issue
Piping Supervisor
Downer Engineering
June 2008 to October 2008
Greenfield?s Caltex Contract Finished
Piping & Mech Supervisor QA
Enerflex
January 2008 to June 2008
Gas Compressor Santos
Piping Supervisor
Monadelphous
October 2007 to January 2008
BP ?Flare up grade
Piping Supervisor
Monadelphous
September 2007 to October 2007
Darwin ? LNG Plant Shutdown
QA Piping / Isolation Co-co-ordinator
Thiess TSJV Pty Ltd
March 2007 to August 2007
? Punch listing FW piping Conveyors, M.T.O, As Built Drawings. Hydrostatic Sign QA Hydrostatic records for ITP& work packs, ? Setting up isolation Plans Directing Group isolators to perform Isolation as directed For Construction & Commissioning For CPP, CHP, OLC, Electrial & Mechanical
Senior Supervisor Brownfield?s
Thiess Pty Ltd Process Division
February 2005 to March 2007
Served as senior supervisor for Brownfield works within existing hydrate classification building, hydrate filtration building and existing precipitation area. Managed various other aspects including implementation of full safety systems, permits, isolation, JESA, JESO and real-time hazard plans and implemented full quality system involving overall weld trace ability and performed weld inspection and mark-ups as well as liaised with operation personnel for equipment isolation and shutdown. Efficiently set up work packs, developed progress job statistics and oversaw work of contractors and Thiess labour.
Supervisor
Transfield Caltex Oil Refinery
February 2000 to April 2005
Alky shut Down: Valves Lines & Fittings & Piping & Exchangers recharge Vessels, on call break down ? Structural Platforms & Piping up grade for RVP Project CDU1/CDU2: Supervisor Crude Shutdown: Valves Lines & Fittings & Piping & Exchangers ? Installation of pig launchers from Caltex to BP ? Installation of new crude bunker line from Caltex to wharf Butane Upgrade: Supervisor ? Replaced 1400Mt?s /4? inch Pipe from Butane spears to cracker/ Alky unit / to tank farm LPG Upgrade: Supervisor ? Replaced 1200Mt?s /4? inch Pipe from LPG Bullet to cracker/ Alky unit / Hydro treater Quench Pumps Upgrade: Supervisor ? Welding 6 x split tee?s & 4 x 4? Stubs & 11 Hot taps & installation of 6 stopples to remove 4 filters & redundant pipe work& in stall new filters & pipe work while vessel is still live & on line Transfield Oil and Gas Exchanger program: Mechanical Piping Shutdown Supervisor ? Implementation of QA Procedures ? Implementation of Safety Management Plans ? Management of Team Leaders and Award Staff ? Oversee day-to-day operations of Site Construction ? All weld trace & mark up ? Implementing Quality Systems Transfield ? Caltex Piping project : Project/Piping Supervisor ? Construction and Implementation of Quality Assurance procedures ? Over see daily operations of Workshop & piping project ? Implementing Quality Systems ? Procedures & work instructions compile MDRs ? Quality & maintain weld procedure specifications & weld Qualifications ? Perform inspection in accordance with ITPs ? Record & verify welders qualified to WPS ? Final inspection of weld & mark up & Drawing to coronate NDT & PWHT ? Along with weld repairs & maintaining repair register ? Coordinating all material & consumable certificates & M.S.D.S ensuring all are correctly stored & numbered.
Education
CERT 3 Polyrthylene processing PMB3017
XLT Training (Australia)April 2016 to May 2016
(BOSTET) OPITO APPROVED
Laemchabang MOG lndustry Training co.,Ltd2013 to 2013
Welding AS1796
McGravatt Collage (Australia)January 2001 to January 2002
Year 12
Wynnum NTH State High SChool1974 to 1979
Languages
English
Bilingual / Native
IT skills
? Proficient in MS Office, MS Project and SAP
Medium
Other Skills
More Ian
Career Goals
Industries of interest
Areas of interest
Availability to travel and work outside the city
Yes