Supervisor in CE & Sons (Maintenance & Projects)
Job Experience
Supervisor
CE & Sons (Maintenance & Projects)
April 2021 to Actually working here
Prepare and installation of brandered ceilings as well as insulation (from start to final.
Installation of ceilings),.
Dismantling and removing of old ceilings and frame work.
Assembling and dismantling of scaffolding.
Prepare and installing of timber ceilings as well as insulation.
Installing and repairing of clad roof structures with corrugated galvanized sheeting.
Prepare and erect timber frame partitions.
Prepare and erect and install dry walling.
Replacing and installation of new glass windows and door glass.
Fit and hang steel doors to a steel frames.
Fit and hang wood doors to a steel frame as well wooden frames.
Installing of carpets on floors.
Cut and fit architraves and skirtings.
Prepare and install open shelving.
Interpret basic building drawings for cupboards, dividing brick walls.
Disconnecting of electrical cables and power points.
Painting of walls and doors.
Demolishing of structures, frames, removal of kitchen cupboards as well as other types of cupboards, removal of floor and wall tiles, cutting and joining of plastic conduit.
Pipes and assisting where necessary.
Internship Student
Henan 4th Consturction Group China - Yellow River Conservancy Technical Institute
March 2019 to March 2020
Student - completed construction engineering technology training.
Supervisor
Coms Africa
April 2017 to March 2019
Fiber installations - telecommunications.
Erect manholes.
Reading of city plans to ensure fiber cables are not interfering with water and other installations on sidewalks.
Splicing .
Industrial Carpenter
Encore Maintenance Solutions
January 2014 to March 2017
Installing doors.
Installing skirtings.
Installing wooden frame doors.
Prepare and erect brandered ceiling and insulation.
Installing ceiling boards.
Installing dry walling.
Shuttering works.
Manufacturing of table tops and shelves.
Setting ut and constructing a howe roof truss.
Fitting and hanging steel doors to frame.
Erect timber and steel framework for beams.
Removal and installation of cupboards.
Painting of walls and doors.
Construct nail plate trusses.
Assistant Project Manager
MBM Molele Building Management
February 2012 to December 2012
Prepare and installation of brandered ceilings as well as insulation (from start to final.
Installation of ceilings),.
? dismantling and removing of old ceilings and frame work.
? assembling and dismantling of scaffolding.
? prepare and installing of timber ceilings as well as insulation.
? installing and repairing of clad roof structures with corrugated galvanised sheeting.
? prepare and erect timber frame partitions.
? prepare and erect and install dry walling.
? replacing and installation of new glass windows and door glass.
? fit and hang steel doors to a steel frames.
? fit and hang wood doors to a steel frame as well wooden frames.
? installing of carpets on floors.
? cut and fit architraves and skirtings.
? prepare and install open shelving.
? interpret basic building drawings for cupboards, dividing brick walls.
? disconnecting of electrical cables and power points.
? painting of walls and doors.
? demolishing of structures, frames, removal of kitchen cupboards as well as other types.
Of cupboards, removal of floor and wall tiles, cutting and joining of plastic ?conduit?.
Pipes and assisting where necessary.
Driver/Sales Rep
Interior Office Concepts
March 2011 to May 2011
Driver/sales rep.
Cabinet Maker
Woodies Woodworks
June 2010 to August 2010
Carpenter cabinet making.
Education
Construction Engineering Technology
Yellow River Conservancy Technical Insitute China (China)January 2019 to January 2020
QCTO Accredited Trade Test : Carpenter
Masterbuilders (Sudáfrica)January 2017 to January 2017
Languages
IT skills
Other Skills
More Renier
Career Goals
Looking for a challenge.
Industries of interest
Areas of interest
Availability to travel and work outside the city
Yes