QA/QC welding inspector in Babcock Hendrina power station
Job Experience
QA/QC welding inspector
Babcock Hendrina power station
July 2013 to Actually working here
assistance project manager
zimplats
August 2012 to September 2012
Assistance Project Mananger
zimplants
August 2012 to September 2012
I was working on 13.5 MVA Electric Arc Furnace Rebuild 2012 I was accountable for maintenance and updates of the project schedule. Managing the project calender, arranging meetings and answering non critical correspondence. Liaising with project conttrols staff to assist with forecasting and budgeting . Preparing progress reports on project status for client and senior management, under the guidance of my project manager in his absence. Proof of reading and correction of both technical and non technical reports. Attending project meetings Maintaining daily project reports Managing scope changes. Ensuring that project deliverables are in accordance with all applicable codes and standards. Facilitating ongoing communication with client . Maintaining good working relationship with internal project team members that support project such as Project Manager, Quality Assurance Manager, Site Manager, QC Inspectors, Site Supervisors and Safety Officers.
QC WELDING INSPECTOR
BABCOCK ENGINNERING ( HENDRINA POWER STATION)
June 2012 to June 2012
WORKING AT ECONOMIZER BOILER FOUR WORKING WITH SOW, QIP, AND BOILER ELEMENTS DRAWINGS, WITNESSING WPS AND WELDERS QUALIFICATIONS, CONTROLLING WELDING CONSUMABLES, WITNESSING NEW TUBES AND WELDING CONSUMABLES TO BE USE, CHECKING PREPING ACCORDING TO WPS, CHECKING OUTSIDE AND INSIDE CLEAN BORE , CHECKING FIT UP AND TACKING, MONITORING WELDING AND DOING VISUAL INSPECTION, WITNESSING NDT REPORTS AND DOING FINAL INSPECTION AND COMPILE DATA PACK.
QC welding inspector
BABCOCK ENGINEERING LETHABO POWER STATION( AMT PLACEMENT)
February 2012 to June 2013
WORKING ON MAIN STEAM PIPE LINE WORKING WITH QIP, SOW, AND CONTRACTION DRAWINGS WITNESSING WPS AND WELDERS QUALIFICATIONS, CONTROLLING WELDING CONSUMABLES, WITNESSING MATERIALS HEAT NUMBERS FOR NEW SPOOLS, CHECKING PREPING ACCORDING TO WPS, CHECKING INSIDE AND OUTSIDE CLEAN BORE, WITNESSING COLD MPI ON OPENING ENDS OF SPOOLS, WITNESSING INSTALLATION OF CAP OR RICE-PAPER INSIDE BIG BORE PIPES, WITNESSING INSTALLATION OF TC's ON BUTTS TO BE WELDED, WITNESSING RISING OF TEMP ACCORDING TO PWHT PROCEDURE,, CHECKING HOT FIT UP FOR ALIGNMENT, CHECKING PRE HEATING WITH TEMPERATURE STICK,SIGNING PHWT CHART ACCORDING TO PROCEDURE, INSPECTING TACKING ACCORDING TO WPS AND INSPECTING ROOT BEFORE CLOSING, WITNESSING HOT MPI AFTER ROOT RUN COMPLETE, WITNESSING HOT MPI AFTER HOT PASS, WITNESSING THE RISING OF TEMPERATURE ACCORDING TO PWHT PROCEDURE, WITNESSING FILLING AND CAPPING ACCORDING TO WPS. INSPECTING PROFILE, TAKING PROFILE SKETCHES, WITNESSING HOT MPI ON GRINDED WELD, WITNESSING THE RAISING , HOLDING, LOWERING AND RECORDING OF AMBIENT TEMPERATURE, WITNESSING REMOVAL OF PWHT COIL AND CLEANING OF WELDED BUTTS, WITNESSING MPI ON POLISHED SURFACE, WITNESSING FINAL MPI, UT, AFTER 48 HOURS, AND SIGN ALL DOCUMENTS FOR DATA PACK
QC WELDING INSPECTOR
QC WELDING INSPECTOR
February 2012 to February 2012
WELDER
AFRICAN MINERAL
May 2010 to August 2010
WELDING AND FITTING STRUCTUTRES
QC welding inspector
BABCOCK ENGINEERING SOUTH AFRICA
March 2010 to June 2012
QC WELDING INSPECTOR
Babcock International Group PLC
March 2010 to February 2012
RECEIVE MATERIALS , WITNESSING WPS AND WELDERS QUALIFICATIONS , CONTROLLING OF WELDING CONSUMABLES FOR JOB , CHECKING CUT OUT AND FIT UP , MONITORING WELDING , DOING VISUAL INSPECTION , WITNESSING NDT REPORTS , DOING FINAL INSPECTION AND COMPILE DATA
Welder
LTA Grinaker
February 2007 to August 2007
welding structures, and Tanks
CODED WELDER
Babcock International Group PLC
September 2006 to December 2009
WELDING STRUCTURES, PIPES , FURNACE PORT ACID TANKS and BOILER TUBES AND MEMBRAINS
Education
Bachelor of Business Administration (B.B.A.)
[Otra]Ashley university (Sudáfrica)July 2013 to January 2013
National Diploma
[Otra]BMT College (Sudáfrica)January 2013 to January 2015
Advance Diploma
[Otra]Grainfield collage (Sudáfrica)January 2012 to January 2012
FAMILIARISATION TRAINING
[Otra]CPUT SIVALVA CENTER (Sudáfrica)January 2011 to January 2011
DIPLOMA
[Otra]SAIW (Sudáfrica)January 2010 to January 2010
CERTIFICATE OF TRAINING
[Otra]SA .WELDING SCHOOL (Sudáfrica)January 2005 to January 2005
Languages
IT skills
Other Skills
More Vuyisile
Career Goals
Industries of interest
Areas of interest
Availability to travel and work outside the city
No