Zafar Hussain

Zafar Hussain

Q.Surveyor in AZ Engineering Associates

MAdyan, Khyber Pakhtunkhwa, Pakistán
Current:AZ Engineering Associates
Past:TECHNO TIME CONSTRUCTION COMPANY (Affiliated with)DAELIM-LOTTE (Joint Venture)
Education:DAE Civil

Job Experience

Q.Surveyor

AZ Engineering Associates

March 2016 to Actually working here


1-Supervise and checked the Quantities of Building & all kind of structure according to drawings
2-Reviewing and verifying Check Request
3-Reviewing progress reports and verifying monthly billing (IPC)
4-Reviewing and verifying Variation order (VO)
5-Reviewing and verifying Extension of time (EOT)
6-Reviewing project specification and Drawings
7-Quality and Quantity control assurance (QA/QC)
8-Supervise and witness inspection test plan for the scope of work and have at approved by the client
9-Inform the site manager of any deviation regarding the contract
Ensure concrete quality from work and steel according to drawing and Specification

Q.Surveyor

TECHNO TIME CONSTRUCTION COMPANY (Affiliated with)DAELIM-LOTTE (Joint Venture)

October 2015 to March 2016

1.Make cross sections of Road ,Coffer Dem, Power House, Diversion Tunnel,Building etc and other structural Quantities of Concrete Backfill and Excavation.
2.Find out the quantities of Material for Plum, Reinforcement Concrete of Breast Walls Retaining Walls.
3.Make IPC?S (INTERM PAYMENT CERTIFICATES) of company
4.Make Variation order, Extension of time of company .
5.Preparation Bar Bending Schedules of Culverts, Breast Walls according to Drawings.
6.Work Plan, Progress Reports, Charts of Quantities Variances.
7.Data receive from Total Station & Make Field Book and Coordinates.
8.Make Summary of bills Included Escalation, Variation Order Work Schedule and Histogram.
9.Supervised Work Done as Per Drawing & Specifications on Site.
10.Deal the consultant oe,s and client.
11.Correspondence with client and consultants.
12.Providing the documents data to survey team
13.Maintain drawings and site data

Q.Surveyor

ENGINEERING ASSOCIATE CONSULTANT (Pvt) Limited (EA)

January 2015 to Actually working here

1. Responsibilities Descriptions :
2. Supervise and checked the Quantities of Building & all kind of structure according to drawings
3. Reviewing and verifying Check Request
4. Reviewing progress reports and verifying monthly billing (IPC)
5. Reviewing and verifying Variation order (VO)
6. Reviewing and verifying Extension of time (EOT)
7. Reviewing project specification and Drawings
8. Quality and Quantity control assurance (QA/QC)
9. Supervise and witness inspection test plan for the scope of work and have at approved by the client
10. Inform the site manager of any deviation regarding the contract
11. Ensure concrete quality from work and steel according to drawing and Specification

Q.surveyor

ZKB-TTC JV

November 2013 to Actually working here

1. Make cross sections of Road areas, Quantities of Concrete Backfill and Excavation.
2. Find out the quantities of Material for Plum, Reinforcement Concrete of Breast Walls Retaining Walls.
3. Make IPC?S (INTERM PAYMENT CERTIFICATES) of company
4. Make Variation order, Extension of time of company .
5. Preparation Bar Bending Schedules of Culverts, Breast Walls according to Drawings.
6. Work Plan, Progress Reports, Charts of Quantities Variances.
7. Data receive from Total Station & Make Field Book and Coordinates.
8. Make Summary of bills Included Escalation, Variation Order Work Schedule and Histogram.
9. Supervised Work Done as Per Drawing & Specifications on Site.

Q.Surveyor

AMIR MUQAM & COMPANY

June 2012 to Actually working here

Make cross sections of Distributaries, Minors, find areas by using Auto Cad.
2. Find out the quantities of Material for Gabion And Situ Concrete Structures.
3. Make IPC?S (INTERM PAYMENT CERTIFICATES) and make Billing for Sub contractors
4. Preparation Bar Bending Schedules according to Drawings.
5. Work Plan, Progress Reports, Charts of Quantities Variances.
6. Data receive from Total Station & Make Field Book and Coordinates.
7. Make Summary of bills Included Escalation Work Schedule and Histogram.
8. Supervised Work Done as Per Drawing & Specifications on Site

SITE SUPERVISOR

KASTEER INTERNATIONAL

March 2011 to Actually working here

1. Supervision of Monitoring of Roads works
2. Site Supervision of on going construction works
3. Preparation of Estimation Based on Material and Labours required with community component.
4. Supervision of Quality and Quantity control of the Project
5. Construction of Street Pavements sewerage sanitation ,Hand Pumps and Dug Wells.
6. Preparation Bar Bending Schedules according to Drawings.
7. Work Plan, Progress Reports, Charts of Quantities Variances.
8. Supervised Work Done as Per Drawing & Specifications on Site.

Education

DAE Civil

Khyber Pukhtunkhawa Board of Technical Education, Peshawar

Currently studying

Languages

English

Medium

IT skills

Ms Office,Auto cad,Eagle Point,Civil 3D

Experto

Other Skills

Quantity Surveyor, Cad Opretor

More Zafar

Career Goals

Industries of interest

Areas of interest

Availability to travel and work outside the city

Yes

Interests and hobbies